Production cycle

1) ENGINEERING
2) MECHANICAL PROCESSING
3) PIPE CUTTING
4) WELDING W1 / W2 AND NDE TESTS
5) INSULATING MATERIAL PROCESS
6) ASSEMBLY
7) WELDING W3 AND NDE TESTS
8) RESINATION
9) TESTS
10) SAND BLASTING AND PAINTING
11) FINAL TESTS
12) PACKING AND SHIPPING

We take care of our products from design to shipping, to guarantee the best quality.